The Detailed Project Report includes complete technical and financial profile of the power plant and list out the statutory clearances required to be obtained. The following information is included in the DPR:

  • General information like location of the power plant
  • Meteorological data, accessibility to site by rail and road
  • Justification as to why the proposed generation scheme is needed vis-à-vis
  • Load-Generation balance studies
  • Least cost option study for various fuel alternatives and sources of supply,
  • source of water and source of plant and equipment
  • Energy absorption plan indicating average yearly generation and dispatch
  • arrangement
  • Energy evacuation plan with a brief write-up on the associated
  • transmission/evacuation system involving construction of new lines as
  • required
  • Financial and executing capabilities like resources available with the
  • promoter and proposed to be deployed for the successful execution of the
  • project
  • Plant technical features containing layout, generating equipment, electrical
  • equipment, control & instrumentation system
  • Civil works of the plant
  • Environmental aspects
    • Emission level
    • Effluent treatment
    • Fly ash management
    • Environment monitoring
    • Resettlement and rehabilitation
    • Forest clearance
  • Project execution & management
  • Cost estimates and financial analysis including basis of the cost estimates,
  • assumptions regarding customs/excise duty, sales tax, escalation, exchange rate etc., funding pattern, source of funding, rate of interest,period of repayment, interest during construction, depreciation calculation etc.
  • Statutory clearances as required to the project